The tenter setting machine is a type of setting equipment with superior performance and ideal processing effect. The operation given to it also has certain requirements. For example, during downtime, the staff also has a lot of places to pay attention to, so as not to adversely affect the equipment. So, do you know what points to pay attention to when the stenter is stopped for operation?
First of all, for the finished guide cloth, we need to place it in the position of the operating table. Then, select the general control button of the tenter and setting machine feeding cloth, turn it to red, and at the same time, select "{{0}}" for the closed upper needle maintenance inlet button. When the cloth guide head reaches the cloth overfeeding roller, the equipment should be shut down, and the cloth guide and the guide belt should be connected at the same time. Close the cooling cylinder tension motor to "0".
Then adjust the equipment to the interface of the heating system. At this time, it is good to adjust the heating temperature to 150 degrees, and adjust the power of the circulating fan at the same time, so as to remove the residual moisture in the stenter and setting machine. After about 30 minutes, turn off the heating equipment, and at the same time ensure the continuous operation of the circulating fan and the exhaust fan, until the temperature in the oven drops to less than 100 degrees.
After these tasks are completed, we turn off the main switch of the power supply connected to the device. Then, the staff should clean the stenter and pay attention to keeping the working environment clean. During this process, an inspection of the equipment should also be carried out to ensure that all components are in good condition and there are no abnormalities such as loosening. At the same time, it is also necessary to ensure that the shutdown work is in place, and the work can only be stopped after the inspection work is completed.
https://www.sunwinmachinery.com/






